Sunday 15 July 2012

Transmission Tunnel

Finished off the transmission tunnel today. We followed the new diagrams form the haynes forum (Link) for the MT75 gearbox as the book is designed around the type 9 box which is slightly narrower. We used 25mm bar for the top front bars not 19mm as we had a load left and not much 19mm bar left. Also buggered up a little bit by lining up the rear bars level with the upright bars where as we should of lined them up above the upright bars but it wont matter and makes it more level anyhow.





Got these mushroom inserts from ebay bargain £26 should be £50... Winner!
They are used to connect the upper front wishbones to the sierra hubs.



Tuesday 10 July 2012

Rear End

Got a bit more done over the weekend quite proud of my effort with the rear diff box section as i did it all on my own :)



Iv been drawing each section of the chassis on Sketchup as we build it this is what we have so far. We have started the transmition tunnel as shown in these pics but i havent got round to taking any actual photos of it yet.



Wednesday 4 July 2012

Main Tub Done

Couldn't resist!


Its taking shape now. Next job will be the transmission tunnel not the rear like the book says because we still need to make the plates for the rear diff and suspension section.